The world leader in recycling used nuclear fuels

As the world's leader in reprocessing and recycling, Orano’s expertise provides its customers with efficient, safe and responsible management of used nuclear fuels. By recovering the 96% of re-useable materials (95% uranium and 1% plutonium) in used fuel, Orano can recycle the material and manufacture new fuel, such as mixed oxide fuel (MOX), for nuclear reactors.
Unloading area of castles T0 - zoom lens fins
2
facilities setting the international standard: Orano la Hague, Orano Melox
2,600
tons of heavy metal produced since 1995 in Melox
983
tons of used fuel processed in la Hague
+34,000
tons of used fuel reprocessed since 1976
50
years of experience in the industry
N°1
World leader in the recycling of nuclear materials and MOX fabrication
Did you know
#{name}

When it comes to recycling used fuels, Orano is unique in the world

A high-performance industrial complex aligned with customer needs

Two sites address the used fuel processing and recycling needs of electricity customers. Located about 15 miles west of Cherbourg, the site in la Hague carries out the first stage of recycling used fuel from nuclear reactors. It is the first industrial centre of its kind in the world.

Located in the Gard, the Melox site manufactures Mixed OXide (MOX) fuel assemblies designed to supply light water reactors in different countries. Melox is the world leader in this market with more than 2,600 tons produced since the start of the plant.

Orano la Hague’s presentation © Capa / Orano
Final waste: 5-times less in volume, 10-times less in radiotoxicity.

Expertise exporting internationally

Orano’s technological lead has been recognized internationally for more than 40 years. Its recycling technologies are now being adopted and developed by multiple countries around the world.

La Hague has processed:

  • Germany: 5,482 tons of used fuel
  • Japan: 2,944 tons
  • Switzerland: 771 tons
  • Belgium: 673 tons
  • Netherlands: 418 tons
  • Italy: 193 tons
  • And, the largest amount, 23,605 tons for French utility EDF

Since 1972, 44 commercial reactors worldwide have been loaded with MOX fuel, including 38 in Europe (22 in France, 10 in Germany, 3 in Switzerland, 2 in Belgium, 1 in the Netherlands).

An industrial cooperation agreement

The “Reprocessing and Recycling” activities in la Hague are part of an agreement between Orano and EDF lasting through 2040. The volumes are defined in specific contracts. The most recent contract, signed in 2015, gives the site an unprecedented workload, with an annual production of 1,100 tons until 2022, and a significant investment in operations.

Operational excellence at work

Orano is committed to operational excellence in how it serves its customers, reducing its operating costs at la Hague by 20% and strengthening product quality in its modernized, Industry 4.0-oriented plants.

Investments to secure and sustain the business

Considerable investments are being made at the la Hague site to secure the long-term operability and safety of the facilities, with €1.6 billion over 8 years, or around €200 million per year.

#{name}

A cycle under control

Through recycling, up to 96% of the reuseable material in used fuel can be recovered: 1% plutonium, and 95% uranium. The remaining 4% of material are fission products, which are non-recoverable waste.

The 1st stage involves processing the used fuel, a reliable process carried out remotely

 

1. Safe receipt and storage of fuel prior to reprocessing

When the used fuel assemblies arrive at the la Hague site, they are first removed from their transport packaging. This operation is carried out remotely, using automated equipment in rooms with concrete walls nearly four-feet thick.
After unloading, the fuel is kept in a storage pool for an average of five years, during which time the fuel’s temperature and radioactivity naturally decreases.

2. Component separation and recovery of recyclable materials
After spending time in the storage pool, the metallic fuel assemblies containing the used fuel pellets are sheared into small pieces before being immersed in a nitric acid solution, which dissolves the nuclear material. A chemical process separates the recyclable materials from the non-recoverable waste (fission products). Through this process, 96% of the nuclear material (plutonium and uranium) is recoverable. The plutonium and uranium are then separated and purified. In the next step, the plutonium is remixed with depleted uranium to produce mixed oxide (MOX) fuel. Customers can then re-enrich the uranium as URE (Recycling Uranium) fuel.

3. Final waste conditioned safely and reliably (4%)
Only 4% of nuclear material from used fuel reprocessing is waste, plus the sheared metal pieces (shells and ends). The fission products are heated, then mixed with molten glass and cast in stainless steel containers, a safe and stable packaging for thousands of years. The waste metal pieces are compacted and placed in storage containers.

4. Temporary, safe and secure interim storage pending final storage
French waste is stored at onsite at la Hague in dedicated rooms pending its transfer to the deep geological storage facility being developed through the CIGEO project. Waste from foreign customers is returned to its country of origin as required by French law.


France’s waste amounts to 5 grams per year per inhabitant.

The 2nd stage consists of MOX, or recycled fuel, manufacture

Mixed oxide (MOX) fuel is produced to supply nuclear power plants around the world (France, Japan, Germany). Production takes place in five stages. Depending on customer needs, the MOX fuel of plutonium and depleted uranium can contain between 3% and 12% plutonium.


Process of 3D manufacturing
Process of 3D manufacturing © Orano
  • The MOX powder mixture is made of plutonium and depleted uranium according to the exact percentages required by the customer
  • Pelleting: the powder is compacted into pellets about the size of a pencil eraser
  • Sintering: the pellets are cooked in high-temperature ovens to form a ceramic material
  • Finishing: the pellets are precisely ground to the required diameter, within a micron of variance
  • Sheathing: the pellets are inserted into thin metal tubes about 13-feet long holding approximately 320 pellets, depending on customer requirements
  • Assembly: These pellet-filled tubes are grouped into a rectangular assembly, the end-product at Melox, which will then be delivered to the customer

The energy in a MOX assembly represents enough electricity to power a city of 100,000 inhabitants for one year.

In France, MOX produces 10% of the nuclear electricity.

Using plutonium to produce electricity for civilian use contributes to nonproliferation.

Over 130 quality parameters are used throughout the MOX production process.


#{name}

Safety and security, an absolute priority

Secure sites under high surveillance

Safety and security are at the heart of all of Orano's processes in la Hague and Melox. Reducing accidents to a minimum and ensuring the safety of both employees and infrastructure are the focus of constant attention at the sites. The measures taken are part of a continuous improvement approach implemented for many years.

The restricted airspace over la Hague is about a 2-mile radius for aircraft flying below 6,560 feet, and is under permanent radar surveillance by the French Air Force.
3D representation of a glove box. All of the nuclear material and manufacturing process are confined within multiple protection layers. 3D representation of a glove box. All of the nuclear material and manufacturing process are confined within multiple protection layers. © Orano

Process Safety Measures

To enable the best possible protection, nuclear facilities are structured with multiple safety barriers to ensure a total containment system for the nuclear material. Three protective barriers combine to isolate the facility with defence-in-depth strategies. Thus, like encased Russian nesting dolls, the nuclear material is isolated in its primary confinement, enclosed within a processing room, and isolated within a secure building.

Risk control

Orano's facilities continually enhance their safety policies based on industry best practices and a continuous improvement approach, in particular by strengthening the safety culture and the Organizational and Human Factors (FOH) reviews.
The Protection, Site and Material (PMS) service includes intervention teams trained in all the site-specific risks (chemical, fire, radioactive, etc.) with an intervention capacity equivalent to that deployed for a city of 30,000 inhabitants.

Operator health under constant protection and monitoring

To keep safety at the highest level, the sites deploy prevention measures and regular training to reduce the likelihood of accidents, improve employee safety, and prepare staff for emergency situations through crisis exercises.

Dosimetric monitoring of process operators show radiation exposure levels well below regulatory limits.

  • Regulatory limit for nuclear operators: 20 mSv/year
  • Average natural background radiation exposure in France: 2.9 mSv/year
  • Exposure of employees in la Hague: 0.152 mSv/year
  • MELOX is committed  to limiting employees’ and subcontractors’ exposure to 10 mSv/year, i.e. half of the regulatory amount

La Hague, Melox, no health impact to surrounding populations and the environment

Each day, dozens of analyses and samples are carried out in the environment to ensure that the radioactivity of products treated on the sites remains below regulatory standards.

  • La Hague: 100-times less impact than natural radioactivity
    In 2017 at la Hague, Orano collected more than 21,000 samples and carried out 48,000 analyses, which demonstrated the site’s lack of health impact on populations and the environment.
  • Melox: impact lower than 0.000001 mSv
    In 2016 at Melox, Orano conducted measurements to determine any impact from the site to local aquatic and terrestrial ecosystems, and to detect any accumulation of radioactive substances from dominant winds. The results showed no impact from the facility on the environment.
MELOX and la Hague: triple certification ISO 9001, ISO 14001 and OHSAS 18001
#{name}

Technologically ahead of the rest, a major asset for Orano internationally

Technically at the cutting edge when it comes to recycling used fuel and safety processing final waste products, Orano is one of world's leading industrial players.

  • United States, technology transfer with U.S. Department of Energy
    Orano partnered with the U.S. Department of Energy to build the MOX Fuel Fabrication Facility (MFFF, or MOX Project) to permanently convert 34 tons of surplus weapon-grade plutonium into nuclear fuel for American nuclear reactors. This facility, under construction since 2007 on the Savannah River Site in South Carolina, combines the functions of la Hague and Melox, and recently transitioned from constructing the external building to installing the internal processing technology.
     
  • Japan, technology transfer for the MOX plant project in Rokkasho-Mura
    The Japanese industrial players responsible for the J-MOX project have requested that Orano MOX fuel technology from Melox be implemented at a facility under construction at the Rokkasho-Mura site in Japan. On March 4, 2014, Orano signed a new framework agreement to further develop this Franco-Japanese partnership. The Group has also signed contracts to receive output from the factory operations, and to supply components for the J-MOX process. In October 2016, Orano continued its technical assistance with a six-month training of four JNFL engineers at Melox as future operators of the J-MOX plant.


  • United Kingdom, assistance contract for plant shutdown
    Orano and Sellafield Ltd signed a five-year assistance contract in December 2016 for the final decommissioning of both the Thorp and Magnox plants at the Sellafield site. In collaboration with the NDA, which is responsible for managing the plutonium stockpile, Orano is considering an overall solution using the plutonium stockpile in a new MOX fuel manufacturing plant to feed the English nuclear reactor fleet.


  • China, trade agreement signed in 2018
    In January 2018, Orano signed a trade agreement with China for the sale of a used fuel recycling plant. Trade negotiations are also underway with China for the supply of two vitrification facilities.

Recycling 4.0, digital transformation speeds up performance

Orano is bringing digital technologies into its fuel cycle activities. Additive manufacturing, Industrial Internet of Things (IoT), Virtual Reality and Augmented Reality have been developing in the Group for several years, serving flexibility and performance.

Innovation serving the facilities

Orano Projets , designs and develops industrial solutions for the Group's installations and activities and for its customers.

For instance, with "Predictive Maintenance - Machine Learning", the predictive maintenance application makes it possible to track construction sites in real time by locating objects, operators, valve status, etc.

Remote operation without visual or physical access is one of the Group’s unparalleled innovations. In 2017, Orano's teams performed a complex welding operation on equipment located in a nuclear area without physical or visual access.

Equipped with computer-assisted remote operation arms and supplemented by 3D, a platform representing the R2 workshop unit was set up in the Orano Projets Research Hall for testing and training.

A complete success, the operation required 124 hours of remote operation shared by 6 employees.

Training and innovation

Innovation is one of the Recycling Business Unit's priorities in preparing its plants for the future. During the "Training and Innovation" seminar held in November 2017, companies were able to share innovative training techniques with our employees.

En poursuivant votre navigation, vous acceptez l'utilisation des cookies. Pour plus d’informations, gérer ou modifier les paramètres des cookies sur votre ordinateur, lisez notre Politique Cookies dans nos mentions légales