Orano - Annual Activity Report 2024 162 4 SUSTAINABILITY STATEMENT Environmental information Analysis results Revenue Orano identified three eligible activities within the meaning of the taxonomy: The eligible turnover ratio is 0.9%. The aligned turnover ratio is 0.2%. Taxonomy activities Environmental objective Rationale for alignment Eligible turnover (in millions of euros) Aligned turnover (in millions of euros) 5.1. Construction, extension and operation of water collection, treatment and supply systems Climate change mitigation Energy consumption criterion not met 33.5 0.0 6.2. Freight rail transport Climate change mitigation GHG emissions criterion met 13.2 13.2 6.6. Freight transport services by road Climate change mitigation GHG emissions criterion not met 7.2 0.0 TOTAL TURNOVER 53.9 13.2 TOTAL GROUP TURNOVER 5,874.0 5,874.0 Ratio 0.9% 0.2% Capital Expenditure (CapEx) Orano analyzed the eligibility and alignment of its capital expenditure (Capex), focusing on eligible activities. The eligible capital expenditure ratio is equal to 10.4%. The aligned capital expenditure ratio is equal to 3.1%. Taxonomy activities Examples of Orano activities or projects Rationale for alignment 2024 Eligible CapEx (in millions of euros) Aligned CapEx (in millions of euros) CLIMATE CHANGE MITIGATION 7.7. Acquisition and ownership of buildings Construction of industrial and tertiary buildings Criteria not met in particular for industrial buildings 70.3 4.7 7.3. Installation, maintenance and repair of energy efficiency equipment Investments related to the mitigation plan and energy performance Criteria met 11.5 11.5 6.5. Transport by motorbikes, passenger cars and light commercial vehicles Electrification of the service vehicle fleet Low-emission vehicles compliant with current European regulations 8.2 2.4 3.4. Manufacture (and recycling) of batteries Development of a new activity of battery recycling Criteria met 4.3 4.3 7.2. Renovation of existing buildings Renovation of tertiary and industrial buildings Criteria not met 4.0 2.2 5.1. Construction, extension and operation of water collection, treatment and supply systems Operation of a seawater desalination plant in Namibia Energy consumption criterion not met. 1.6 0.0 7.4. Installation, maintenance and repair of charging stations for electric vehicles in buildings (and parking spaces attached to buildings) Support for the electrification of the service vehicle fleet No substantive criteria or specific DNSH 1.0 1.0 5.2. Renewal of water collection, treatment and supply systems Renewal of water networks Criteria not met 0.7 0.0
RkJQdWJsaXNoZXIy NzMxNTcx